• alt text
  • alt text

Contracting body Diputación Provincial de Huesca

Year of construction 2011

BYPASS IN EGEA

A 2 kilometer stretch of road with a 152 meter long viaduct, 55 meter tall piers, with the central pier measuring 62 meters and lateral ones 45. Built with onsite piers and prefabricated hyperstatic deck assembled with a beam launcher. It is the first prefabricated bridge in the world built with a beam launcher and spans longer than 60 meters.